Today I started by drilling and then bolting the F-631C and F-631D angles to the F-705 bulkhead. With the angles in place I clecoed on the F-774 Skin and F-788 gusset and then clecoed in and match drilled the F-732A channel and F-732F spacer to the F-774 skin and F-706 bulkhead.